Menu
Home
Forums
New posts
Search forums
What's new
New posts
Latest activity
Members
Current visitors
Log in
Register
What's new
Search
Search
Search titles only
By:
New posts
Search forums
Menu
Log in
Register
Reply to thread
Click here to become an Official Member of BMW Club Malaysia
Download Form
Home
Forums
The Classifieds
Vendor's Zone
Bimshop Singapore
Bimshop FB Updates Apr 2015 (For non-FB folks)
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Message
<blockquote data-quote="Bimshop Singapore" data-source="post: 731550" data-attributes="member: 32145"><p><u><strong>28 Apr 2015</strong></u></p><p></p><p><span style="font-family: 'Verdana'">A Before & After picture of exposed wiring being reinsulated using our liquid insulation. </span></p><p><span style="font-family: 'Verdana'">This is a minimum 5 layer job with drying off with the use of fan, for 5 mins in between each layer. </span></p><p><span style="font-family: 'Verdana'">Each job will take at least 1/2 hr and above, depending on severity of the wiring degradation. </span></p><p><span style="font-family: 'Verdana'">Thereafter, complete curing of the liquid insulation will take another 24 hrs. </span></p><p><span style="font-family: 'Verdana'">Once that is done, the wiring will be thoroughly protected by its new 'skin'.</span></p><p></p><p><span style="font-family: 'Verdana'"><a href="http://s432.photobucket.com/user/bimshop/media/BMW/FB2015/Apr2015/e64lci_reinsulation_beforeafte_zpsq4l2ep8d.jpg.html" target="_blank"><img src="http://i432.photobucket.com/albums/qq42/bimshop/BMW/FB2015/Apr2015/e64lci_reinsulation_beforeafte_zpsq4l2ep8d.jpg" alt="" class="fr-fic fr-dii fr-draggable " style="" /></a></span></p></blockquote><p></p>
[QUOTE="Bimshop Singapore, post: 731550, member: 32145"] [U][B]28 Apr 2015[/B][/U] [FONT=Verdana]A Before & After picture of exposed wiring being reinsulated using our liquid insulation. [/FONT] [FONT=Verdana]This is a minimum 5 layer job with drying off with the use of fan, for 5 mins in between each layer. [/FONT] [FONT=Verdana]Each job will take at least 1/2 hr and above, depending on severity of the wiring degradation. [/FONT] [FONT=Verdana]Thereafter, complete curing of the liquid insulation will take another 24 hrs. [/FONT] [FONT=Verdana]Once that is done, the wiring will be thoroughly protected by its new 'skin'.[/FONT] [FONT=Verdana][URL=http://s432.photobucket.com/user/bimshop/media/BMW/FB2015/Apr2015/e64lci_reinsulation_beforeafte_zpsq4l2ep8d.jpg.html][IMG]http://i432.photobucket.com/albums/qq42/bimshop/BMW/FB2015/Apr2015/e64lci_reinsulation_beforeafte_zpsq4l2ep8d.jpg[/IMG][/URL][/FONT] [/QUOTE]
Verification
Post reply
Home
Forums
The Classifieds
Vendor's Zone
Bimshop Singapore
Bimshop FB Updates Apr 2015 (For non-FB folks)
Top
Bottom